Project Overview
Improvements include the construction of a 10-foot wide, shared-use trail on the We Energies Powerline corridor parallel to N. 20th Street between W. Olive Street and W. Villard Avenue and on the former Beerline Rail corridor between N. 24th Place and N. 20th Street.
The resulting improvement will total 1.65 miles of new trail.
The trail will cross six streets and include enhanced crossing treatments at these locations, such as high visibility crosswalks, curb extensions, median refuges, or other features. The proposed project will also include wayfinding signs along the trail.